Calgary to Spend $700,000 Replacing 300 Peace Bridge Light Fixtures

Calgary to Spend $700,000 Replacing 300 Peace Bridge Light Fixtures

Nobembe 4, 2016

The city is spending $700,000 to replace 300 light fixtures on the Peace Bridge that can’t take Calgary’s cold winters, reports the Calgary Sun.

Crews from Allied Projects have begun installing new LED light fixtures on the iconic $24.5-million helical steel structure, designed by Spanish architect Santiago Calatrava.

The current lights on the popular attraction, which have previously been replaced under warranty, just weren’t cut out for Calgary’s chilly winter, according to the city.

“The original light fixtures were sort of rated for indoors, that was the technology they had at the time, that’s what was chosen,” says Anna Melnick, a spokeswoman with the city’s roads department, in the Calgary Sun article.

“The harsh Calgary weather was getting to them. They were just burning out, it was too cold… These new LED lights will be good for 15 to 20 years. The old lights were only good for three to five years,” Melnick says.

Replacing all 300 light fixtures is expected to be completed in December and while cyclists and pedestrians can still use the crossing during repairs, it will be narrower because one side of the bridge will be closed while crews work.

Melnick says the new light fixtures will also improve safety on the Peace Bridge because the LED lighting will allow pedestrians and cyclists to see details clearer while crossing the structure.

The bridge is one of Calgary’s most photographed structures at night.

Read the full article: www.calgarysun.com/2016/10/25/new-peace-bridge-lights-to-cost-700000.

Photo source: MacDougall Steel Erectors Inc., which installed the bridge.

 

Related Articles


Changing Scene


Design

  • Case Study: Windsor Family Credit Union (WFCU) with Salex SW

    Case Study: Windsor Family Credit Union (WFCU) with Salex SW

    February 6, 2024 Since 1940, WFCU Credit Union is a prominent and forward-thinking financial institution based in Windsor and Essex County. For over 80 years, WFCU has been dedicated to serving Ontario residents, community, organizations, small businesses, commercial entities, and public institutions. Their new headquarters in Kitchener was created as they continue to grow their… Read More…

  • Coaticook Suspended Footbridge: An Ever-Changing Luminous Canvas, Painted by Nature

    Coaticook Suspended Footbridge: An Ever-Changing Luminous Canvas, Painted by Nature

    December 5, 2023 At 170 m (554 ft) long and 50 m (160 ft) high, the Coaticook Canyon Bridge at Parc de la Gorge de Coaticook is one of the longest suspension footbridges in North America and one of the most popular tourist attractions in the Eastern Townships. For several years, the Parc de la… Read More…


New Products